Railings, bike-shed frames, balustrades, sports cages, sprayed in a school-holiday window. Stripped, primed, polyurethane top-coat. CRB-cleared technicians where the brief asks. Pupils back to clean steel.
Specced, scheduled, paperwork on the day, signed off against your spec sheet. Out-of-hours where the site demands it.
Summer six-week and half-term breaks worked back from end-date. Spec, prep, prime, top-coat, finish. Multi-site portfolios handled across the same window.
Multi-use games areas with steel cage perimeters often need a full strip back to substrate. Done over the long break, ready for new term.
Estate railings, stair balustrades, ramp handrails. Either spot-touch where corrosion is patchy or full strip-back where it's been let go.
RAMS, COSHH and CRB clearances available where the LEA or trust requires them. Method statements signed off ahead of the school gate closing.
Questions we get on most school & public steelwork enquiries before pricing.
Same team, same paperwork, different scope. One contractor across the building.
Most enquiries start with a five-minute call to confirm scope, sector and shutdown window. Drawings or schedules ideal but not essential to get a price moving.
Quickest by phone or WhatsApp with a photo. Or send the form and we will be back with a price and a programme inside 48 hours.